Day Two: Barn Construction



Building supplies arrived first thing this morning. Because the forecast called for rain, I wasn't expecting any building activity. But a crew arrived shortly after the delivery and began installing the large 6 x 6 posts that form the barn's skeletal structure.



By the end of the day, all 24 posts were in the ground, upright and secured to temporary bracing. Concrete was mixed on site and poured into each hole. After the crew left, I walked through what could now be called a structure and began picturing how the animals would be housed, what would fit in the milkroom, and how the stairs would reach the upper level.